
Centralized solutions for generating solar energy can be split into three main functional blocks: the smart junction box which provides the key bypass functionality for a string of cells at the panel level, the string combiner box which provides the protection and monitoring functions of the solar panel, and the high-voltage multi-level string inverter that also implements the Maximum Power Point Tracking (MPPT) algorithm aimed at maximizing the transfer of energy from the panel, voltage adaptation and grid synchronization. [pdf]

Max continuous output – 1350W Peak/surge capacity – 2700w Normal Input voltage – 12V, DC Input voltage range 11-14DC Max efficiency – 90% Output voltage – 115VAC ± 5% Output frequency – 60Hz ± 2Hz Output waveform – Modified Sine Wave Low voltage shutdown – 10.5 ± 0.5V Over voltage shutdown – 15.5 ± 0.5V No load current draw – 0.5A Recommended input wire size – #4 Recommended ANL fuse size – 250A Dimensions – 13″ Length x 6″ Width x 3″ Height Built in remote control jack. [pdf]

Off-grid solar systems are usually larger in inverter size due to independent operation and reliance on battery storage, matching Battery Bank capacity with peak load and integrating complex functions (e.g., battery management); whereas on-grid systems are smaller in inverter capacity due to interconnection with the grid, matching solar panel power and ensuring grid synchronization, with simplified functional design and a relatively low cost. [pdf]

AMPYR Australia Pty Ltd (AMPYR) and Shell Energy Operations Pty Ltd (Shell) propose to develop and operate the Wellington Battery Energy Storage System (the project), located approximately 2.2 km north-east of the township of Wellington in the Dubbo Regional Council local government area (LGA) and within the New South Wales (NSW) Government declared Central-West Orana Renewable Energy Zone (CWO REZ). [pdf]

The proposed project finances three (03) main components: firstly, it will finance the construction of two (2) new 33/11kV substations, the upgrading, rehabilitation and reinforcement of two (2) 33/11kV substations; the rehabilitation and upgrading of low voltage distribution lines (140km) as well as the installation of 10 compact 11/0.4kV substations and 100 distribution transformers in the Banjul metropolitan area. [pdf]
We are committed to excellence in solar power plants and energy storage solutions.
With complete control over our manufacturing process, we ensure the highest quality standards in every solar system and energy storage cabinet we deliver.