
The assembly solution for container type energy storage system integrates the assembly line, the heavy load handling system and the warehousing system, and the process flow of assembly line includes container loading/unloading, material preassembly, power cable and electrical system assembly, loading PACK to rack & pre-tightening, PACK tightening, wire harness connection, Hipot test & labeling, weak current system debugging and PCS test. [pdf]

The installation process for an energy storage container involves the following steps:Preliminary planning and assessment: Evaluate your energy needs.Site assessment and preparation: Assess the installation location.Detailed installation instructions: Follow step-by-step instructions for installation.Integration with existing energy sources: Integrate the system with other energy sources.Maximizing performance: Optimize the energy storage system’s performance1.Container energy storage is usually pre-installed with key components, making the installation process simple and efficient2.. [pdf]

The Energy Storage Shipping Container installation requires adequate space for the container dimensions plus additional clearance (typically 1-1.5 meters on all sides) for proper ventilation, maintenance access and safety compliance, with specific requirements varying based on the Container Battery Energy Storage capacity and local regulations that may dictate minimum spacing from buildings or property lines. [pdf]

The whole line includes container online,sealing plate removal,fan installation,circuit installation,fire test,water pipe installation,through-wall pipeline installation,PACK into the box,PACK fixing,branch hose connection,distrubtion cabinet installation,DCDC instalation,overall cabling,manual reinspection,pressure testing,qirlight test,status test,liquid injection,function test,cleaning and gluing and sealing off the box. [pdf]

It includes the additional requirements for BESS, such as connection scheme, choice of switchgear, normal operating range, immunity to disturbance, active power response to frequency deviation, reactive power response to voltage variations and voltage changes, EMC and power quality, interface protection, connection and start to generate electric power, active power management, monitoring, control and communication, and grid-connected tests. [pdf]
We are committed to excellence in solar power plants and energy storage solutions.
With complete control over our manufacturing process, we ensure the highest quality standards in every solar system and energy storage cabinet we deliver.